How to roll-up cycle times and costs of MBOM in Aras MPP Process Plans?
At the moment, we can add cycle times and setup times to operations, and cycle times to steps. But this information does not display anywhere once entered. That is fine, but at least if there was the ability to roll-up the cycle times of all the operations in the Process plan, taht would be great. Has anybody attempted this on their isntances? On a similar vein, the phantoms and MBOM only parts consumed have costs associated with them (for ex. I intend to have 'Material' category parts in the MBOM (we use polyureethanes for casting) as the quantity and hence the cost of the material is a process parameter and not an EBOM item. Is there any way to roll-up the 'MBOM cost'? Would appreciate if anybody could point me in the direction of how to set this up Regards Sachin27KViews0likes11CommentsHow to Import Data from Aras Innovator V11.Sp12 to V12.0
Hi, I recently installed Aras Innovator V12.0. I was using Aras Innovator V11.Sp12 where all my work was done. Now, i would like to switch to V12.0, I have few tables around 9 tables in which two tables of Manufacturing Process Plan and Operations, the rest are customized item types. How can i import the data of some of the tables which i need from V11.Sp12 to V12.0. Thanks.2.4KViews0likes0CommentsHow to add items in Manufacturing process plan Workbench
Hi Folks, I'm working on Manufacturing process plan in Aras innovator version 11 SP12. I would like to add other items, which have a relationship with operations, in the workbench to select, drag and drop the items into the operation. I tried to modify the method: 'mpp_GetWorkbenchGridHeader' as shown in below picture. but it didn't work? how i can do to add other items along with machines,tools etc. In my case, other items are OperationList, MachineModels as shown in the below image. Thanks. Regards, Venkat Sai2.2KViews0likes0Comments