• Scheduled/Automated Tasks

    Hello all, We are currently using Version 11 SP 9 of Aras Innovator. Is there an inbuilt way to schedule/automate tasks and activities? An example of such task would be to schedule automated Excel extracts at the end/start of every month. Thanks very…
  • Automatic Parent-relationship in Child item set, when Child-relationship set from Parent item

    Hi, I have created a Document-to-Document relationship for the Document itemtype with the goal of relating child documents to the parent - simple enough. However, now I want to design a system such that it behaves as below: I open the Parent document…
  • EZ Installer - Headless Installation from Config

    I would like very much to have a command line install instruction with a config. Instead of all the GUI interaction and clicking and typing in the installer I would very much like to do something using JSON, especially, or A|XML that covers all the…
  • Can I dynamic set activity to auto?

    Former Member
    Former Member
    I have a activity.(Not Auto) But I want to add assignment and auto to next activity. Thank you.
  • Automatic Lifecycle status changing

    Former Member
    Former Member
    Hi, Automatic lifecycle status change by using workflow. I have created the lifecycle and workflow. Basically when one task is finished in an workflow then the lifecycle status should be changed automatically for an item type. how it is possible…
  • How to auto login use the parameter?

    Former Member
    Former Member
    How can I use the ID and Password auto login the Innovator? EX: localhost/.../default.aspx
  • How to Automatic Activity by dynamic?

    Former Member
    Former Member
    I have a activity(A). If A have assignment then not automatic. If A not have assignment then automatic. How to Automatic Activity by dynamic?