How to roll-up cycle times and costs of MBOM in Aras MPP Process Plans?

At the moment, we can add cycle times and setup times to operations, and cycle times to steps. But this information does not display anywhere once entered. That is fine, but at least if there was the ability to roll-up the cycle times of all the operations in the Process plan, taht would be great. Has anybody attempted this on their isntances?

On a similar vein, the phantoms and MBOM only parts consumed have costs associated with them (for ex. I intend to have 'Material' category parts in the MBOM (we use polyureethanes for casting) as the quantity and hence the cost of the material is a process parameter and not an EBOM item. Is there any way to roll-up the 'MBOM cost'? Would appreciate if anybody could point me in the direction of how to set this up

Regards

Sachin

Parents
  • Yep, stepelementrenderer was the right answer! You will notice that there are a lot of similar Methods that render all kind of stuff you see in MPP. As all the various elements have their unique look&feel, my version for the Operations may not work for the other elements the same way. I also would add the cycle_time to the caption, just like you did. 

    I also prefer option 2 for doing the rollup, as we normally need these kind of data in the db for various purposes. 

    We can use a similiar concept that is used for the Files flag in ItemType Manufacturer Part and Document. Take a look at the ItemType Document File. There you can find a Server Method that is called at 4 different events. We can use a modified version of this Method for 4 server events in the mpp_Step ItemType, that makes a SUM of the cycle_time property.

    There are two options:

    1. Trigger a SQL procedure (just like the files flag Method) that makes a SUM of the step cycle_times and writes the value in the operation cycle_time

    SELECT SUM(CYCLE_TIME) AS SUM
    FROM innovator.[ <-- add source itemtype --> ]
    WHERE (SOURCE_ID = ' --- add source_id--- ')

    2. Use AML instead of SQL procdure.You normally just use SQL procedures, when you really have no other options. When we work inside a ProcessPlan, we already have full permission access to Operations and Steps. So it should be possible update the cycle_time with AML.

Reply
  • Yep, stepelementrenderer was the right answer! You will notice that there are a lot of similar Methods that render all kind of stuff you see in MPP. As all the various elements have their unique look&feel, my version for the Operations may not work for the other elements the same way. I also would add the cycle_time to the caption, just like you did. 

    I also prefer option 2 for doing the rollup, as we normally need these kind of data in the db for various purposes. 

    We can use a similiar concept that is used for the Files flag in ItemType Manufacturer Part and Document. Take a look at the ItemType Document File. There you can find a Server Method that is called at 4 different events. We can use a modified version of this Method for 4 server events in the mpp_Step ItemType, that makes a SUM of the cycle_time property.

    There are two options:

    1. Trigger a SQL procedure (just like the files flag Method) that makes a SUM of the step cycle_times and writes the value in the operation cycle_time

    SELECT SUM(CYCLE_TIME) AS SUM
    FROM innovator.[ <-- add source itemtype --> ]
    WHERE (SOURCE_ID = ' --- add source_id--- ')

    2. Use AML instead of SQL procdure.You normally just use SQL procedures, when you really have no other options. When we work inside a ProcessPlan, we already have full permission access to Operations and Steps. So it should be possible update the cycle_time with AML.